FISIA BABCOCK ENVIRONMENT CMBH
- Executive Project and Project Management for the installation of a desulphurization plant in groups I and II of the Thermal Power Station of Alcudia (Mallorca) – (May 2005-December 2007).
GAS AND ELECTRICITY GENERATION
- Legalization Projects and Project Management for Construction, installation and launching of two turbines: TG 4 and 5 on the CD Mahon (December 2007-April 2010).
- Project Management for Construction, installation and launching of two turbines: TG5 and 6 on the CD Ibiza (December 2007-December 2009).
- Legalization projects and project management for the expansion of 66 kV Substation in CD Ibiza (December 2007-December 2009).
- Project Management for Construction of new 132 KV Substation: CD Ibiza (2009) .
- Project Management of enlargement of Power Station in Ibiza: Groups 19 and 20 (November 2006-November 2007) .
- Executive project and project management for “Demolition and dismantling old facilities in Mahon CD” (Year 2007).
- Executive project to install four gas turbines in Diesel Plant in Ibiza, Groups 6B, 7, 8 and 9 (Year 2009).
- Legalization projects and project management for the project of construction, installation and launching of the expansion of 132 KV substation in the CD Mahon – (July 2008 / April 2010).
- Legalization Projects and Project Management for extension of Auxiliary Services CD Mahon (May 2010-November 2010).
- Executive project and project management for passage to Gas Groups 19 and 20 in the CD of Ibiza (2011- 2013).
- Project Management for Construction, installation and launching of Water Treatment Plant in CD Ibiza (July 2010- …).
- Legalization projects and project management for installation and launching of new 15 kV Substation in Ibiza CD (July 2011- …).
ENDESA GENERATION
- Writing of several projects for the installation of new Generating Groups in CD Ceuta (TG12 – Year 2007 Group 13 – Year 2007/08) and Melilla (Group 15 – 2008).
- CENIT CO2: Executive Project and Project Manager for the R + D + i “Experimental construction of a plant for CO2 capture in afterburning gases in UPT Compostilla” (2008 to 2010).
- Detail Engineering, Project and Project Management for “Improvements in DG Groups IV-V in UPT Compostilla” (2010 – 2011).
- Regional and Performing Oxycombustion-300 Compostilla project, for the Adequacy of the land and infrastructure necessary to accommodate future expansion of the plant Compostilla II “(- 2013 2012) Project.
- Provision of technical services to support the operation and maintenance of the installation test chemical absorption of CO2 in UPT Compostilla (2010-2013).
- R & D project for CO2 fixation and valuation by using photosynthetic microorganisms. Performing engineering services for optimization, operation and maintenance support of microalgae pilot plant located in the Litoral UPT (ENDESA) (2014 – Present).
ENERGY CITY FOUNDATION(CIUDEN)
- Detailed engineering for “Slab foundations for boiler buildings CBS, MECANOTAF and pipe rack” (May / June 2009).
- Technical advice during construction and installation phases of the project “Industrial Experimental Plant for CO2 capture in Coal Oxycombustion processes ” (August 2009-October 2010).
ILTMO. VEGA DE ESPINAREDA TOWN HALL
- Project and Project Management for Construction of Municipal Park “The Entralgo” (2002).
- Project and Project Management of electrical installations, air conditioning and ICT in a public building “Municipal Cultural Center” (2004).
- Technical advice during the drafting of the construction project of E.D.A.R. for the municipalities of la Veg de Espinareda and Fabero (2004).
- Project and Project Management for Construction of Fairground in El Espino (2004).
- Detailed engineering and project management for the construction of Footbridge over the river Cua (2008).
- Project and Project Management for Construction of Municipal Main Square (2011).
- Project and project management for the construction, installation and launching of LMT and new transformer center to provide power to Public Building (2011).
THE REGIONAL GOVERNMENT OF CASTILLA Y LEON
- Project and Project Management of electrical installations, air conditioning and adaptation of basement and garage for “New Town Hall in Vega de Espinereda” (2009).
EXCMA.PROVINCIAL COUNCIL OF LEON
- Project and topographic survey of the road from Burbia to Vega de Espinareda – Phase III. (1999).
- Various Projects and Project Management for Infrastructure works and urbanization in several towns in the province of Leon (renewal of supply and sanitation networks, public lighting installation, sports facilities, etc.) (2000-2011).
- Energy audit services and proposed measures to improve efficiency in Inverna Station in San Isidro (2015).
GRUPO LAMELAS VILORIA – AGAZOS
- Detailed engineering of Electric Air Line 400 KV with a capacity of 1000 MVA between Substations Torre del Bierzo and Montearenas (2015).
- Preparation of technical and economic tender documents for the extension of the drainage tunnel and remedies against corrosion in the Metro tunnel Yerevan (Republic of Armenia) (2015).
- Preparation of technical file for Reversible Hydroelectric Plant ” Puryfing – Pumped Hydraulic Energy Storage P-PHES NAVALEO” in T. M. Torre del Bierzo, for feasibility study and inclusion in the grants program of the EU (2015).
GROUP DURO FELGUERA
- Detail engineering for the construction of conveyor belts for the expansion of Coals Park in UPT Compostilla. (December 2008-March 2009).
- Technical services in the development of As-Built engineering of C. T. Son Reus II Combined Cycle (2005).
- Technical services in the development of As-Built engineering of C. T. Barranco de Tirajana Combined Cycle – Gran Canaria (January-February 2006).
ISOLUX CORSÁN
- Engineering for the foundations of the LFC and VTI boiler in the platform works for technological development CIUDEN (August 2010).
- Engineering for the foundations of water heater in the platform works for technological development CIUDEN (August 2010).
- Justifying memory calculation block wall for electrical room closures and modification of planes (September 2010).
- Engineering for the foundations of the desulfurization unit and duct VTI on the platform works for technological development CIUDEN (October 2010).
- Integration Engineering of a Plant for CO2 Capture and Purification build on the Experimental Platform for CO2 capture CIUDEN (August 2011March 2012).
PRONABI
- Solar tracking design, detailed engineering and launching of Photovoltaic Solar Park 300 Kw in the municipality of Ponferrada (December 2007June 2008).
- Supervision and maintenance of electrical and control system in Photovoltaic Solar Park 300 Kw – (July 2008 – present).
SOTEKO – E.D.A.R. BURGOS
- Detailed engineering for evacuation Substation of three Cogeneration Generator groups in E.D.A.R. Burgos. (October 2011-January 2012).
NATIONAL UNIVERSITY OF DISTANCE EDUCATION-UNED
- Technology Project execution to generate Audiovisual AVIP platform that will service all UNED centers in the national territory (October 2006November 2007).
VARIOUS PROJECTS AND DESIGNS
- Design, Structural calculation, 3D Modeling and Technical Management for the construction of many industrial buildings with different uses:
- Wood processing (Maderas Hermanos Rubio, 2003).
- Meat Industry (bottlenose, 2006-07).
- Winemaking cellars (Bodegas Gancedo, 2007).
- Warehouses for manufacturing and repair of boats (Astilleros de El Ferrol, 2006).
- Warehouses in Illescas and Seville for aircraft manufacturing (final customer Airbus and EADS-2007/2008).
- Commercial and logistics centers in different parts of Spain for final customers: Carrefour, El Corte Ingles, Factory, etc.
- Public buildings, hotels and industrial buildings with more than 11 floors.
- Structures for power plants.
- Design and Calculation of Silos and support structures, pedestrian walkways, bridges and vehicle access ramps.
- Technical services for evaluation of the restoration of Small Hydraulic Power Plants (BEFESA-2004).
- Projects and Technical Management for a multitude of MV and LV facilities, climate control and telecommunications infrastructure in buildings and commercial premises:
- Outdoor lighting in the parochial church San Andrés – Vega de Espinareda (2002).
- Teodoro Carballo building – Benavente (Farelo and Folgueral – 2004).
- Los Luceros building – Ponferrada (Farelo and Folgueral – 2005).
- Commercial Building – Cuatrovientos (Hardware Martínez – 2005).
- Sports center in the municipality of Caboalles (2006).
- Neighborhood Node Building – Aviles (FuenteCanal Promotions – 2006).
- Emergency Diesel Groups facilities for wind power components factory – Ponferrada (2008).
- Sports space lighting – la Vega (2010).
- Project and Technical Management for Accreditation of Industrial Machinery and Lifting and Transport accessories according to Community Directives CE Marked.
- Transfer Tables CE marked and lifting accessories for manufacturer TEMANE (Year 2006/07).
- Legalization of Tower Crane and CE marked several hoists for construction of desulphurisation plant in Alcudia CT FISIA BABCOCK (Year 2006).
- CE marked various hydraulic and industrial tools for the manufacturer CBH Bierzo (Year 2014 – Present).
- CE marked movable truck for maintenance and service works at the dam for the company Bárcena AGAZOS (2014).
- CE marked of industrial machine for sterilization and processing of chestnuts made for CBH Bierzo (2014).
ESS y CSSL
- INDUSTRIAL CHEMISTRY NALÓN, S.A. – Installation of water pretreatment in Nalon River in Trubia.
- ASTURIANA ALLOYS, S.A.
- Removing hearth furnaces and installation of new aluminum foundry in Aviles.
- Installation for materials mill.
- Warehouse construction.
- Coordination of annual shutdowns for factory machinery maintenance.
- THYSSEN HENSCHEL, S.A. – Construction of factory for production of fingers in the industrial area of Vega de Baiña, Mieres (15,000 m2).